1, 000, 000 Nm3/Day Modular Natural Gas Processing & Liquefaction Plant

Introducing our 1,000,000 Nm3/Day Modular Natural Gas Processing & Liquefaction Plant. As a factory, we specialize in efficient natural gas processing and liquefaction, providing reliable and high-quality products.
Request a Quote

PRODUCTS DETAILS

  • Overview
  • About Us
  • Product Description
  • Process Technology
  • Customer Benefits
  • Reference List
Overview

Basic Info.

Model NO.
100W
LNG Output
2tph, 3tph, 5tph
Turndown Ratio
65%~110%
Process Selection
S-Mrc, D-Mrc, Propane-Mrc
Gas Purification
Yes
Transport Package
Seaworthy Packing
Specification
As required
Trademark
Greenfir
Origin
China
HS Code
8421399090
Production Capacity
30 Sets/ Year

Product Description

About Us

Greenfir is a professional natural gas processing & liquefaction plant, air separation unit, heat exchanger, reciprocating piston compressor, cryogenic cold box, fractionating column manufacturer and solutions provider with ISO 9001: 2015, ISO 14001: 2015, ISO 45001: 2018 and ASME U certified.
We offer skid-mounted solutions optimized for each specific project, covering the following applications: Air Separation Plant, LNG Plant, Gas Purification & Liquefaction Unit, CNG/ LNG/ L-CNG Filling Station, Flare Gas Recovery Unit and Hydrogen Purification Unit, etc. We can deliver skid-mounted solutions customized to meet client's challenges and requirements (including adverse weather conditions, transportation and plot area limitations, etc).
We treat all the cryogenic solutions with serious attitudes and professional experience. Combined with our knowledge and experience, Greenfir provides each client with a technology-leading solution you can count on and bring a wider range of options and more profits.

1, 000, 000 Nm3/Day Modular Natural Gas Processing & Liquefaction Plant
Product Description
1, 000, 000 Nm3/Day Modular Natural Gas Processing & Liquefaction Plant
Modular Equipment -The Solution for Gas Processing
Greenfir provides solutions for your gas processing project, including shop fabrication, construction management, startup, and operations. We offer a range of solutions to best meet your gas processing needs - from straightforward dew pointing operations, to maximum NGL recovery.
Modular Design for Reduced Costs and Predictable Timelines
Our modular gas processing plants are factory-built using a unique design and construction approach that allows for quick fabrication and superior quality control. Due to pre-fabricated construction, your plant can be shipped by truck - even to remote locations. Upon delivery to a prepared worksite, the equipment is ready to install. Modules are designed to fit together rapidly, significantly reducing site construction time, expense and associated delays.
Process Technology

Greenfir liquefaction technologies are mostly based on the MR (mixed refrigerant) technology. It is designed with a closed loop refrigerant cycle, thereby eliminating make-up or chemical/ logistics handling for the refrigerant. The main elements of the plant are as listed below, while different modules can be incorporated to improve the efficiency of the plant according to the specific project requirements.

Main System
  • Filtering & Metering Skid
  • Gas Purification System (Acid Gas Removal package, Dehydration Package, and Mercury Removal Package)
  • Liquefaction (Cold Box, MR Compressor, etc.)
  • LNG Storage
  • LNG Loading System
  • Utilities (Instrument Air & PSA Nitrogen Generattion Package, Demineralized Water System, Hot Transfer Oil System)
  • Instrumentation Control System
  • Electrical Control System
  • Feed Gas Booster Compressor(s) (Optional)
  • Nitrogen Removal Column (Optional)
  • Heavy Hydrocarbons Separation (Optional)
  • Biol-off Gas Handling (BOG Compressor) (Optional)
  • Power Generation (Optional)
  • etc.
Customer Benefits

-  Robust and reliable technology that is simple to operate.
-  Designed for unmanned operation.
-  Easy start-up and shut down of all systems.
-  Quick and easy capacity control.
-  Compact and modularized design ensures easy shipment and cheaper installation.
-  The lowest specific power consumption in small size plants.
-  All components based on conventional parts and proven technology -> Spares can be delivered quickly.
-  Reliable main rotating machinery with high efficiency.
-  Local control of LNG export -> truck driver handles the loading.
-  Fast project delivery time (FOB 7 months for the MRC Process).
-  Broad range of applications, biogas, pipeline, CBM and associated gas

 

1, 000, 000 Nm3/Day Modular Natural Gas Processing & Liquefaction Plant
1, 000, 000 Nm3/Day Modular Natural Gas Processing & Liquefaction Plant
1, 000, 000 Nm3/Day Modular Natural Gas Processing & Liquefaction Plant

Our extensive service offerings, coupled with our unmatched technical knowledge and experience, can help you focus on profitability.

Reference List
Project Scope of Supply Capacity Quantity Location Year
Natural Gas Purification, Liquefaction Plant
50,000 Nm3/day Wellhead Gas Recovery Project EPC   1 China Nov. 2016
30,000 Nm3/day Mini LNG Plant EPC   2 China May, 2017
30,000 Nm3/day Wellhead Gas Recovery Project EPC   1 China May, 2017
30,000 Nm3/day Mini LNG Plant EPC   1 China Nov. 2018
50,000 Nm3/day Wellhead Gas Recovery Project EPC   1 China Nov. 2019
60,000 Nm3/day Mini LNG Plant EPC   1 China Nov. 2018
Demethanizer and Deethanizer Rectification System EP 20,000 Nm3/day   Kazakhstan Jul. 2020
CNPC 100,000 Nm3/h Mini LNG Plant EPC   2 China Jan. 2021
ARV 50 TPD Mini LNG Plant Project EP, Supervision Commissioning & Start-up 50 TPD 1 Irian Apr. 2021
MAN 3.5 MMSCFD Mini LNG Plant Project EP, Supervision Commissioning & Start-up 3.5 MMSCFD 1 Irian Apr. 2021
50,000 Nm3/day Mini LNG Plant EPC   1 China Aug. 2021
Ethylene Compressor Station EP, Supervision Commissioning & Start-up 17.88 MMSCFD   Irian Apr. 2022
MAR 20 MMSCFD Amine Sweetening Package Project EP, Supervision Commissioning & Start-up 20 MMSCFD 1 Irian Dec. 2022
KHE 13 MMSCFD Field Flare Gas Recovery Project EP, Supervision Commissioning & Start-up 13 MMSCFD 1 Irian Dec. 2022
100,000 Nm3/h Mini LNG Plant EPC   2 China Dec 2022
Deethanizer Rectification System EP 30,000 Nm3/day 1 Kazakhstan Mar. 2023
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours